East Brampton Watermains
Name:
Justin Wassink
Company:
Jacobs
Phone:
(905) 926-8236
Email:
Email hidden; Javascript is required.
Co-Authors:
Nicole Sartor
East Brampton Watermains
Description:
The East Brampton Watermains for the Region of Peel will include 5.1 km of twin 1500mm and 1200/900mm transmission watermains installed within a 4.5-meter diameter rock tunnel. The alignment will include highway and rail crossings, four shafts up to 21 meters wide and maximum depth of 35 meters.
Nature of Project:
- Case Study
Trenchless Technology Involved:
- Tunneling
If a case study is being discussed, confirm that the owner has given permission for the material to be presented.
Yes
Has the presentation been previously given at other events or conferences? (Non-NASTT events)?
No
Entry Date: