Columbia Sewer Rehabilitation - Sliplinning under Difficult Conditions

Name:

Joshua Redmond

Company:

Jacobs

Phone:

(604) 808-0012

Email:

Email hidden; Javascript is required.

Co-Authors:

Paul Luscombe

Columbia Sewer Rehabilitation - Sliplinning under Difficult Conditions

Description:

New Westminster Interceptor - Columbia Section is a 1500 mm sewer that surcharges and is in disrepair with some sections of the existing RCP pipe having half the wall thickness eroded. Metro Vancouver and Jacobs worked evaluated live flow rehabilitation techniques and delivered a solution that can be rapidly implemented.

Nature of Project:
  • Case Study
Trenchless Technology Involved:
  • Lining/Sliplining/Coating
If a case study is being discussed, confirm that the owner has given permission for the material to be presented.

Yes

Has the presentation been previously given at other events or conferences? (Non-NASTT events)?

No

Entry Date:

March 1, 2021